Eliminate Crowding with Modular Classrooms
|
 |
| |
 |
Benld Elementary School, IL
Benld Elementary School was in desperate need of additional classroom and
administrative space after the mine underneath the school collapsed, resulting in the
building being condemned. M Space provided the school with a classroom complex
that included 26 classrooms, media center, band and choir room, cafeteria, offices and
restroom space.
Read more about this project
|
 |
Cameron Parish School District, LA
Hurricane Ike hit Louisiana in September of 2008. The area hardest hit by the hurricane
was Cameron Parish, located in the bottom left corner of the state. Communities across
the parish were destroyed leaving 75-94 percent of the population homeless, and the
entire parish under a State of Emergency. Two major high schools in the parish, South
Cameron and Johnson Bayou, were destroyed and no other facilities were available for
the high schools to use. Cameron Parish needed classroom space as quickly as possible.
Using a combination of new and used buildings, M Space provided Cameron Parish with
classroom, restroom, kitchen and cafeteria space in just 42 days. South Cameron High
School received 46 classrooms and a cafeteria with a kitchen, while Johnson Bayou
received 20 classrooms and a cafeteria with a kitchen.
Read more about this project
|
 |
Sherman Elementary School, CT
M Space worked closely with the school district to design and construct a permanent,
noncombustible building that would match the existing school. It consists of six classrooms
and two multi-stall restrooms. The building sits on a full perimeter concrete foundation
with a brick ledge and intermittent piers. The full brick exterior was carefully selected
to match the existing school.
Read more about this project
|
 |
Alachua Traffic and Safety School, FL
The Alachua County School District in Florida needed a new facility to house their Drivers Education Program. The building was set at grade level on the North end of the Drivers Education Course with sidewalks
and canopies. This allows the students to easily access the training course
from the classrooms. The building consists of four simulator classrooms
and administrative offices for the staff.
Read more about this project
|
 |
Pinellas School District, FL
The Pinellas School District had to close several schools due to budgetary
constraints. The students from these schools were transferred to other
schools throughout the district resulting in the need for additional
permanent classroom space for the 2009 school year.
M Space provided the Pinellas School District with 50 side-stacking
classrooms located at eight different schools. The 24 x 36 classrooms
sit side by side on each of the campuses. There are 2 to 11 modules per
school and M Space strategically placed them in between other buildings
on campus so they appear to be part of the original school.
Read more about this project |
 |
Dallas Community College, TX
The new program led to an increase of students on campus, and left DCC in need of an additional building. They needed the new building to be constructed quickly, affordably, include interior flexibility and address security concerns.
Read more about this project |
 |
Charlottesville Waldorf School, VA
Charlottesville Waldorf School in Charlottesville, VA has spent the last twenty-five years educating their students on the importance of taking care of the environment, and making strides towards having the “Greenest School in America”. The most recent step towards that goal was to have a new ‘green’ modular classroom built on their campus.
Read more about this project |
|
|