Case Studies: Corporate & Commercial
|
 |
| |
|
 |
First Energy Nuclear Power Plant. Beaver Valley, PA
When FENOC of the Beaver Valley Power Station in western Pennsylvania needed office space that could serve as swing space for them while construction was underway, M Space Holdings, LLC was the modular company they selected to provide them with a custom built 34,560 square foot building.
Read how M Space meets the challenge |
 |
Florida Fish and Wildlife Research Institute, Tequesta, FL.
The Florida Fish and Wildlife Research Institute (FWRI) is dedicated to protecting, conserving, and managing Florida’s marine and costal resources. FWRI saw the need to add another field lab to its existing six laboratories. FWRI chose modular construction as the easiest and quickest solution to their space problem.
Read how M Space meets the challenge
|
 |
Howland Port Authority of NY/NJ
Howland Hook Marine Terminal has a growing container facility in the Port of New
York and New Jersey. It is located in the northwest corner of the Borough of Staten
Island in New York City. With 124 additional acres purchased in 2001 added to
the original 187 acre site, the facility is growing. The Port Authority at Howland
Hook needed additional administrative space that included offices, breakroom,
and locker facilities for its employees.
Read how M Space meets the challenge |
 |
First Southern Bank, Florence AL
First Southern Bank was interested in placing a temporary branch office in Florence, AL. They decided to use modular construction in order to place a temporary building in Florence that could be removed easily if a base market was not established.
Read how M Space meets the challenge |
|
|